Blanchard Roof Replacement, Same Crew Both Days
A tear-off and a new roof, photographed at the open deck, finished by the crew that started it.
Ask who stays for the tear-off — (000) 000-0000
When a tear-off is the right day
Replacement is the job when the shingles across the slope have given up, rather than one boot. Curled tabs, lost courses, and a roof that already carries a second layer are the usual reasons. A sound field with one cracked boot is a repair, and the same crew will say so rather than pull a roof that can stay.
People in Blanchard often call after a run of patches. The crew treats that as a reason to look at the whole field, not as a reason to add one more patch on top of the others. The crew also looks at the starter course and the ridge before they call the day a tear-off. A ridge open to the wind, or a starter that has slipped, tells them the slope will not hold another season of patches. They say that while they are still up there, and the same people are the ones who would pull it. You are not handed a guess from a desk that never climbed the ladder. The felt, the flashing, and the last course stay with that crew through the day they start.
The open deck is part of the day
Once the shingles are off, the crew photographs the wood before anything covers it. A soft sheet is named then. You can see the photo and hear which sheets are being replaced. The crew does not cover a rotten sheet and mention it later.
If rain is close, they cover the opening or they wait to pull the next section. The crew that opened the roof is the crew that has to close it, so they do not start a section they cannot finish.
Who nails it back
The same crew installs the underlayment, the flashing, the boots, the field, and the ridge. Gutters are theirs too when the job includes them. A magnet pass ends the day. The truck does not leave the nails for a different visit.
Lifetime warranties, when the finished job carries them, are stated in the paperwork. The crew will hand you that paperwork. They will not describe the cover as something wider than the document.
How the day gets set
Call and describe the roof. The crew walks it, says whether it is a tear-off, and sets the day. You are not passed to a production office that has never seen the house. If the walk shows a repair is enough, that is the job they offer, and they are the ones who would do the repair. The ridge, the starter, and the drip edge are not leftovers. They are named while the crew is still on the roof, and the same people install them. You can stand in the yard and see who is doing the last course. That is the point of keeping one crew: the end of the job is done by the people who saw the deck, not by whoever was free on Friday.